Renovating a Commercial Space in Port Alberni: What to Sort Out Before You Sign the Lease

Most of the commercial calls I get come in after the lease is already signed. Someone's found a spot on Third Avenue or Johnston Road, the keys are in hand, opening day is circled on the calendar, and now the space needs to look like a café, a clinic or an office by then.
Sometimes that works. Often the date was set before anyone asked the questions that actually decide it. So here's what a commercial renovation in Port Alberni really involves: who pays for what, the permits, the code upgrades nobody budgets for, and how long it takes. Ideally you read this before you sign anything.
1. Read the lease for who pays for what
Commercial work splits into two buckets. Base building is the landlord's: the roof, the structure, the main electrical service, the shared plumbing. Tenant improvements are yours: interior walls, finishes, lighting, fixtures, the counter, the back room.
Where that line sits is written into the lease, and it's negotiable before you sign.
Things worth looking for:
A tenant improvement allowance. Some landlords will put money toward your fit-out, especially on a longer term or a space that's sat empty.
Approval requirements. Most leases say the landlord signs off on drawings before work starts, and many require proof that your contractor is licensed and insured. (Here's what to check when you're choosing one.)
A restoration clause. Some leases make you put the space back the way you found it when you leave. That changes how much you want to build in.
Get it in writing. A handshake about "the landlord will sort the roof" is worth nothing when the roof leaks onto your new flooring in January.
2. Changing the use is the big one
This is the question that decides whether a job takes four weeks or four months. What was the space approved for, and what are you turning it into?
Office to office, or retail to retail, is mostly finishes and layout. But retail to restaurant, office to clinic, warehouse to gym, or anything to food service is a change of use. The Building Code looks at the space under its new occupancy, and that can bring in fire separations, more exits, more washrooms, ventilation changes and accessibility upgrades all at once.
Before you sign, ask the landlord what the space was last permitted as. If it's a change, ask us to look at it before you commit. A half-hour walkthrough can save you from a lease on a space that can't become what you need without a five-figure surprise.
3. Permits and who signs off
Cosmetic work like paint, flooring and new fixtures in the same spots usually doesn't need a permit. Moving walls, adding plumbing, or changing electrical or mechanical systems does. Commercial work tends to involve more sign-offs than residential:
A building permit from the City of Port Alberni, or from the municipality or regional district if you're outside city limits. The full breakdown of who you apply to is here.
Electrical and gas permits through Technical Safety BC, pulled by the licensed trades doing that work.
Professional drawings. Larger buildings and many change-of-use jobs need plans sealed by an architect or engineer. That adds weeks up front, so start early.
Island Health if you're serving food. They review plans for food premises before construction, not after.
Permit review time is the part nobody controls. Build it into your opening date instead of hoping it goes quickly.
4. Plan for accessibility from the start
A renovation can trigger accessibility requirements that the space never had to meet before: an accessible washroom, a level entrance, wider doors, clear turning space. It's far cheaper to design for it on day one than to find out at plan review and redraw. And frankly, it's good business. Your customers include people with walkers, wheelchairs and strollers.
5. What's behind the walls in older commercial buildings
A lot of the commercial stock in this valley is old. That's part of its charm, and it's also where budgets go sideways.
Hazardous materials. Buildings from before 1990 need a hazardous materials survey before demolition or renovation under WorkSafeBC rules. Asbestos in old flooring, drywall mud and pipe wrap is common.
Electrical capacity. An old service sized for a shoe store won't run a commercial kitchen, a salon full of dryers, or a server room.
Plumbing. Food businesses usually need a grease interceptor, and older drain lines don't always cooperate.
Previous tenants' work. Three fit-outs stacked on top of each other, none of them permitted. We see it more than you'd think.
If the whole building needs attention, not just one unit, that's a different kind of project. We handle those too, under large-scale renovations.
6. Keeping an existing business open while we work
Not every commercial job is a new tenant. Plenty are businesses that have outgrown their space or are overdue for a refresh and can't afford to close for two months.
That's workable. We phase the job so one area is under construction while the rest stays open, keep dust walls and negative air on the work zone, and do the loud or disruptive work after hours where it makes sense. It takes more planning up front, and that planning is cheaper than lost sales.
Timing helps too. Commercial interiors are indoor work, so our wet winters barely slow them down. For a lot of retail and tourism businesses here, the quiet months are the best time to do it.
7. How long it actually takes
Every space is different, but the stages are predictable:
Design and drawings: two to six weeks, longer if an architect or engineer is involved.
Permit review: anywhere from a few weeks to a couple of months, depending on the scope and whether the use is changing.
Construction: two to four weeks for a cosmetic refresh, six to twelve weeks or more for a full fit-out.
Work backwards from your opening date with those in hand and you'll know quickly whether it's realistic. If you're negotiating a lease, this is also your case for asking for a rent-free fixturing period.
The bottom line
Sort out who pays for what. Find out whether the use is changing. Start drawings and permits early. Expect older buildings to hide something. Then set the opening date.
If you're looking at a space, the best time to call me is before you sign. I'll walk it with you, tell you what I see, and give you a number and a timeline you can actually plan a business around.